Wuhan oil pipeline crossing the river back to drag the successful |
|
Entry time??%=rs("addtime")%> | |
Recently, the Yangtze River's first oil pipeline crossing the river back to drag the right branch one-time successful perforation. Wuhan oil pipeline crossing the river is the construction of petrochemical storage and transport facilities, infrastructure, an important part of the North-South network connection into pieces oil bonds. The order of the closed pipeline transportation technology, design input capacity 3.5 million tons / year. 18 km pipeline length, diameter 355 mm throughout the laying of pipelines, station control system using PLC to complete the data acquisition and control. Wuhan channel for the river to completed and put into operation soon, the whole project through river by three contractors simultaneously, by the right branch of Yangtze River by the middle of the river's day-to-left Hing Chau Chu River braided and directional drilling, then welded pipe Back to the drag link. Wuhan Petrochemical through the first stop from the big village tank had to wear the river, oil depot north of Wuhan. |
|
News Center Location??a href="Enindex.asp">Home >Trends > News